Stanley Day Park
Brisbane City Council
Service
Remediation
Type
Soccer Field
Turf type
Nullarbor Couch
Handover
September 2021
Value
$150k
A soccer field remediation completed with premium sports turf and established with a customised maintenance program.
7,000m2 of premium Nullarbor Couch turf
627t of imported top soil
410lm of site fencing
Key Processes
Site establishment
Field was fenced, surveys conducted and environmental and safety control plans were initiated under council protocol.
Ground preparation
Field was topmaked to 30mm for the removal of grass thatch and weed. Disposed of green waste material at approved landfill site.
Soil Amendments
Soil amendment products were blecevated at 150mm depth and incorporated in to the profile.
Irrigation
Audit and service of irrigation system which required the replacement of faulty sprinkler heads to ensure it is fully functional.
Final Levels
Importation and GPS laser grading of 630T sports blend top soil to achieve a +/- 10mm final level.
Turf Installation
7000m2 of premium Nullarbor Couch was installed, rolled then treated with OxaMax fertiliser and pre-emergent.
Maintenance
6 week intensive maintenance program consisting of mowing, top dressing, aerating, fertilising and pest and weed control including line marking.
Profile Cultivation for High Performance
- Topmaked with the GKB Combinator CB200
- Rotary hoed to 200mm depth
- Gypsum, lime and fertiliser amendments incorporated into profile
- Surface preparation and profile contouring using GPS guided technology and Lawless AgriGrade 2800 Laser Bucket
The Transformation
Similar Projects
O'Callaghan Park, Zillmere
Learn MoreDolphins Stadium, Redcliffe
Learn MoreTaigum Place Park, Taigum
Learn MoreMitchelton Park, Gaythorne
Learn MoreSouth Pine Sports Complex, Moreton Bay Region
Learn MoreBribie Soccer Complex, Moreton Bay Region
Learn MoreD.M. Henderson Park
Learn MoreGiffin Park, Coorparoo
Learn More